John Holland
John Holland are Australia and New Zealand’s leading end-to-end integrated infrastructure, building, rail and multi-modal transport company.
John Holland are delivering the Tranche 2 works as part of the wider Inland Rail Beveridge to Albury (B2A) Project.
Tranche 2 works include replacing road bridges, lowering rail tracks and station modifications, to enable the safe operation of double-stack freight trains across eight B2A project sites in Victoria, between Wandong and Benalla.